EFFICIENCY ANALYSIS OF BUILDING PROCUREMENT AND MANAGEMENT PLAN USING THE LIFE CYCLE COSTING METHOD

Authors

  • Muhammad Simba Sembiring Universitas Sumatera Utara
  • Dedy Suryadi STIEB Perdana Mandiri Purwakarta
  • Rahmawaty Arifiani STIEB Perdana Mandiri Purwakarta

Keywords:

Procurement of Goods Services, Building Planning, Life Cycle Costing

Abstract

Trisakti University, in planning the resources needed, including plans for the procurement of goods and services, needs to make analytical calculations regarding these procurements with a comprehensive tool. This study aims to simulate the process of planning the procurement of goods/services by also considering various procurement options for goods/services, especially the required building. The Life Cycle Cost (LCC) method is used to evaluate the costs that must be incurred in the Trisakti University procurement plan. From the simulation results for the procurement of a new 8-story building with a building area of 14,216 m2, it can be concluded that the most efficient procurement alternative is the procurement of a building with a budgeted value of IDR 152,063,123,498.

Downloads

Download data is not yet available.

References

H. P. Barringer, “A life cycle cost summary. international conference of maintenance societies (ICOMS-2003),” Perth. West. Aust., 2003.

U. Trisakti, “Penjelasan Rencana Kebutuhan Barang Milik Negara UPKPB: Politeknik Keuangan Negara STAN Tahun 2016,” 2016.

K. Jones and A. D. White, RICS public sector asset management guidelines: A guide to best practice. Royal Institution of Chartered Surveyors, 2008.

A. S. Kamaludin, “ANALISIS KEMUNGKINAN PENERAPAN METODE LIFE CYCLE COSTING DALAM PERENCANAAN PENGADAAN BARANG/JASA UNTUK MENINGKATKAN EFISIENSI BIAYA (STUDI KASUS KANTOR PUSAT BADAN PENGAWASAN KEUANGAN DAN PEMBANGUNAN).” Politeknik Keuangan Negara STAN, 2016.

A. P. Silva and A. A. Fernandes, “INTEGRATING LIFE CYCLE COSTING ANALYSIS INTO THE DECISION MAKING PROCESS IN NEW PRODUCT DEVELOPMENT,” in DS 36: Proceedings DESIGN 2006, the 9th International Design Conference, Dubrovnik, Croatia, 2006, pp. 1419–1426.

M. D. Shields and S. M. Young, “Managing product life cycle costs: an organizational model,” J. cost Manag., vol. 5, no. 3, pp. 39–52, 1991.

S. K. Fuller and R. P. Stephen, “Life Cycle Costing Manual,” NIST Handb., vol. 135, 1995.

R. Haribowo, H. Tannady, M. Yusuf, and G. W. Wardhana, “Analisis Peran Social Media Marketing , Kualitas Produk Dan Brand Awareness Terhadap Keputusan Pembelian Pelanggan Rumah Makan Di Jawa Barat,” vol. 3, no. October, pp. 4024–4032, 2022.

R. Agustina, M. Yusuf, O. S. J. Sutiyan, R. Ardianto, and N. Norvadewi, “EMPLOYEE PERFORMANCE MEDIATED QUALITY OF WORK LIFE RELATIONSHIP SATISFACTION ON THE JOB AND ORGANIZATIONAL COMMITMENT,” J. Darma Agung, vol. 30, no. 2, pp. 589–605, 2022.

W. Kurniadi, L. Natalia, A. Lotte, P. A. Cakranegara, F. Sampe, and M. Yusuf, “HANAN WEDDING PLANNER ’ S MARKETING COMMUNICATION STRATEGY FOR INCREASING SALES IN THE COVID-19 PANDEMIC ERA ON THE TIKTOK APP,” vol. 11, no. 03, pp. 1359–1364, 2022.

S. Sutrisno, P. A. Cakranegara, F. Asri, M. Yusuf, and J. Sahala, “STRATEGY FOR MSME DEVELOPMENT USING FINANCIAL TECHNOLOGY TO INCREASE CAPITAL AND CONSUMERS,” J. Darma Agung, vol. 30, no. 2, pp. 677–686, 2022.

M. Yusuf, Z. Afifah Fitriyani, A. Abdilah, R. Ardianto, A. Suhendar, and U. Pertiwi, “THE IMPACT OF USING TOKOPEDIA ON PROFITABILITY AND CONSUMER SERVICE,” J. Darma Agung, vol. 30, no. 2, pp. 559–573, Aug. 2022, doi: 10.46930/OJSUDA.V30I2.2273.

M. Yusuf, Z. A. Fitriyani, A. Abdilah, R. Ardianto, and A. Suhendar, “THE IMPACT OF USING TOKOPEDIA ON PROFITABILITY AND CONSUMER SERVICE,” J. Darma Agung, vol. 30, no. 2, pp. 559–573, 2022.

D. G. Woodward, “Life cycle costing—Theory, information acquisition and application,” Int. J. Proj. Manag., vol. 15, no. 6, pp. 335–344, 1997.

S. B. Yudhoyono, “PERATURAN PEMERINTAH REPUBLIK INDONESIA NOMOR 23 TAHUN 2005 TENTANG PENGELOLAAN KEUANGAN BADAN LAYANAN UMUM,” 2005.

Downloads

Published

2022-09-30

How to Cite

Sembiring, M. S., Suryadi, D., & Arifiani, R. (2022). EFFICIENCY ANALYSIS OF BUILDING PROCUREMENT AND MANAGEMENT PLAN USING THE LIFE CYCLE COSTING METHOD. Jurnal Ekonomi, 11(02), 1538–1544. Retrieved from https://ejournal.seaninstitute.or.id/index.php/Ekonomi/article/view/1509