FACTORS WHICH FORM COSTS IN CONSTRUCTION COMPANIES IN SURABAYA
Keywords:
Construction Costs, Quality Control, Job Optimization, Productivity, Inventory PerformanceAbstract
The goal is to recognize and examine the factors that shape costs in construction companies in Surabaya. The sample of this research used employees at construction companies in Surabaya. The sample group is equivalent to the full population, namely 103 respondents. Research variables used in the study are: Product Quality Improvement (x1); Increased Worker Productivity (x2); Reducing Unnecessary Costs (x3); Material Order Timeliness (x4); Material Delivery Timeliness (x5); Materials and Tools Inventory (x6); Rework; (x7) Company overhead (x8); Cost of Materials/Materials (x9); Project duration (x10); Performance optimization (x11); Ensure inventory and tool performance (x12); Company performance control (x13); Rework (x14); Reduced rework (x15); Management of the financial performance of the firm (x16); Improving the financial performance of the firm (x17); Material cost control (x18); Optimizing material costs (x19); Control the time working on the project (x20); and Optimizing project execution time (x21). The approach employed in this study is quantitative exploratory. The analytical approach utilized is exploratory factor analysis. The findings indicated that from 19 tested indicators, 6 factors formed the cost of construction companies. The six factors that shape costs in construction companies are: timeliness of orders, contractor costs, quality control, optimization of project work, on time delivery and inventory performance, and financial control.
Downloads
References
Anggi Angga Resti. (2021). Financial Performance Assessment of the Value of State-Owned Companies in the Construction Sector Listed on the Indonesia Stock Exchange, Journal of Management and Business Review, 18(2): 379-391. doi:10.34149/jmbr.v18i2.290
BMI Business Monitor International Research (2016). Indonesia Infrastructure Report 2016. London (UK): BMI Research
DJPKTN. (2021). Budget Implementation Performance Indicators (IKPA) as a Control Tool in Supervising the Financial Performance Management of Work Units. https://ditjenpktn.kemendag.go.id/pojok-media/indikator-kinerja-pelaksana-anggaran-ikpa-sebagai-alat-kontrol-dalam-melakukan-pengawasan-pengelolaan-kinerja-keuangan-satuan-kerja
Hair, J.F., et al (2006). Multivariate Data Analysis (5th ed). New Jersey: Perasrson Prentice Hall.
Immanuel, R., & Yuwono, B. E. (2020). Shop Drawing Maturity as a Determinant of Rework of Construction Projects. Indonesian Journal of Construction Engineering and Sustainable Development (Cesd), 3(1), 42. https://doi.org/10.25105/cesd.v3i1.8023
Jayani, I., & Ruffaida, F. S. (2020). The effectiveness of workforce skills training in increasing productivity. Economic Education Study Program, FKIP University of Flores, 8(April 2019), 274–282.
Kam, K. J., Lim, A. S. H., Al-Obaidi, K. M., & Lim, T. S. (2018). Evaluating Housing Needs and Preferences of Generation Y in Malaysia. Planning Practice and Research, 33(2), 172–185. https://doi.org/10.1080/02697459.2018.1427413
Monica. (2018). The Effect of Price, Location, Building Quality and Promotion on Interest in Buying Safira Bondowoso Park Housing. Management Science and Research, 6(9), 36.
Primalasari, A., Indarti, I., & Adnanti, W. A. (2020). Analysis of Central Java Economic Growth for the Period 2013 - 2017. Scientific Journal of Assets, 21(2), 63–70. https://doi.org/10.37470/1.21.2.147
Rizal, A., Zain, A. M., & Setiawati, D. A. (2019). Cost Estimation Modeling Based on Material Prices and Labor Wages. Siimo Engineering, 3(1995), 1–4.
Surbakti, D. S. (2018). The relationship between wage level and the performance of interns (case study : company x co., ltd, japan) thesis.
Sutrisno, T. F. C. W. (2021). Relationship Between Total Quality Management Element, Operational Performance And Organizational Performance In Food Production. Angewandte Chemie International Edition, 6(11), 951–952. , 2013–2015.
Widiasanti, I., Rizqy, M. I. N., Ariadhy, R. Z., Alpinas, G., & Ryzki, J. (2021). Analysis of The Needs of Fixing Materials in Shear Structures. Journal of IKRA-ITH TECHNOLOGY, 5(2), 5–7.