Waluyo, M. H., Pattiruhu, J. R., & Ferdinandus, S. (2023). ANALYSIS OF NETWORK PLANNING WITH THE CRITICAL PATH METHOD IN THE FRAMEWORK OF PROJECT TIME AND COST EFFICIENCY (Case Study of the Implementation of the Masnana Section Road Construction Project – Wali, Namrole District, South Buru Regency). Jurnal Ekonomi, 12(02), 1776–1781. Retrieved from https://ejournal.seaninstitute.or.id/index.php/Ekonomi/article/view/2149