WALUYO, M. H.; PATTIRUHU, J. R.; FERDINANDUS, S. ANALYSIS OF NETWORK PLANNING WITH THE CRITICAL PATH METHOD IN THE FRAMEWORK OF PROJECT TIME AND COST EFFICIENCY (Case Study of the Implementation of the Masnana Section Road Construction Project – Wali, Namrole District, South Buru Regency). Jurnal Ekonomi, [S. l.], v. 12, n. 02, p. 1776–1781, 2023. Disponível em: https://ejournal.seaninstitute.or.id/index.php/Ekonomi/article/view/2149. Acesso em: 30 apr. 2026.