Design and Development of a Web-Based Sewing Process Monitoring System Using Key Performance Indicators at PT Eclat Textile International
Keywords:
Key Performance Indicator, Production Monitoring, Quality Control, Sewing, Information SystemAbstract
This study aims to design and develop a web-based production process monitoring information system that supports the management of Purchase Orders (POs) and the Cutting, Sewing, and Quality Control (QC) processes. The problem encountered in the production process is the need for integrated data management and traceable monitoring of work status at each production stage. The developed system, named PT. Eclat Textile International, implements role-based access rights for four user roles, namely Admin, Cutting, Sewing, and QC. The research method employed is information system design and development through the stages of requirements identification, system design, implementation, and testing. The system integrates the recording of production activities through production tracking, the management of inspection indicators through the Master QC KPI, and the recording of inspection results in three categories: products that pass inspection (pass), products that require rework (rework), and rejected products (reject). The rework mechanism also enables jobs requiring correction to be returned to the Sewing stage. Testing was conducted using the Black Box Testing method on ten main test scenarios. The test results showed that all tested functions operated as expected, with a success rate of 100%. The PT. Eclat Textile International system can support integrated recording, monitoring, quality control, and production history tracing.
References
D. F. Zahra and D. Yulianti, "Web-based clothing and fabric stock data processing information system at PT . Crevis Tex Jaya," J. Mandiri IT, vol. 11, no. 4, pp. 159–166, 2023.
S. I. Manajemen, Sistem Informasi Manajemen. 2024.
J. Suwarno, "Perancangan Sistem Informasi Monitoring Produksi Sepatu Berbasis Web Pada Pt. BKM," Sainstech, vol. 32, no. 1, pp. 1–6, 2022.
Tiaraningsih, A. Nugroho, and Karsito, "Perancangan Sistem Informasi Monitoring Produksi Pada PT . NOK Indonesia Metode Rapid Application Development ( RAD )," Ris. dan E-Jurnal Manaj. Inform. Komput., vol. 9, no. 3, pp. 1087–1099, 2025.
P. Faisal, M. C. Gumilar, and M. D. Alfandi, "Development of a Web-Based KPI Evaluation System Using SAW and Design Science Research †," 2025.
N. Rizqi, A. Larasati, C. N. Laksana, and E. Mohamad, "Business Intelligence System Design Based on Performance Monitoring Dashboard Using Online Analytical Processing ( OLAP ) Method," vol. 6869, 2023, doi: 10.23917/jiti.v23i2.6016.
H. D. Yulianto and R. B. Firdaus, "Perancangan Sistem Informasi Monitoring Magang," Indones. J. Inf. Syst., vol. 6, no. September, pp. 130–136, 2021.
R. I. Akbar, D. Suhardini, and P. Astuti, "Perancangan Model Pengukuran Kinerja Menggunakan Sustainability Balanced Scorecard di PT XYZ," vol. 12, no. 1, pp. 83–90, 2022.
R. Sitanggang, T. U. Dachi, and I. H. G. Manurung, "Rancang bangun sistem penjualan tanaman hias berbasis web menggunakan php dan mysql," J. Teknol. Kesehat. Dan Ilmu Sos., vol. 4, no. 1, pp. 84–90, 2022.
M. Aditya, S. Sundari, and M. Pakpahan, "Pengaruh Key Performance Index Terhadap Motivasi Dan Kinerja Karyawan," vol. 2, no. 1, 2024.
P. Shirty, T. Mawuntu, and C. Aotama, "Pengukuran Kinerja UMKM Berdasarkan Key Performance Indicators ( KPI ) Metode Balanced Scorecard," vol. 21, no. April, pp. 72–83, 2022.
N. Indrianti, "Perbaikan Proses pada Departemen Sewing Menggunakan Pendekatan the 8 Steps Problem Solving untuk Menurunkan Tingkat Kecacatan TALENTA Conference Series Perbaikan Proses pada Departemen Sewing Menggunakan Pendekatan the 8 Steps Problem Solving untuk Menuru," vol. 6, no. 1, 2023, doi: 10.32734/ee.v6i1.1922.
M. Sholikhah and M. Abdulrahim, "Pengoptimalan tenaga kerja pada proses produksi kaos guna meminimasi keterlambatan dalam penyelesaian pesanan: (Studi kasus: Konveksi SNG)," vol. 5, no. 1, pp. 28–38, 2022.
A. Widiantoro, "Analisis pengukuran kinerja serta upaya perbaikan menggunakan metode performance prism dan traffic light system," vol. 4, no. 1.
S. Anisa and G. H. Pradipto, "Analisis Kinerja Mesin Endforming Menggunakan Metode Overall Equipment Effectiveness ( OEE ) Untuk Meningkatkan Produktivitas Di Perusahaan Manufaktur Indonesia," Indones. J. Multidiscip. Soc. Technol., vol. 4, no. 2, pp. 736–742, 2026.
N. Setiawan and M. Annisa, "Pengukuran kinerja produksi Hot Strip Mill dengan metode Overall Equipment Effectiveness (OEE)," pp. 153–160, 2017.
P. Kaur, K. Marriya, and R. Kashyap, "An Assessment of Organizational Factors in Lean Implementation in Apparel Export Units of National Capital Region," vol. 5, no. 6, pp. 2000–2004, 2016.
N. N. Purba et al., "Faktor-Faktor Yang Memengaruhi Tingkat Penyaluran Kredit Pada BPR Konvensional Di Indonesia," vol. 2, no. 2, pp. 105–117, 2016, doi: 10.17358/JABM.2.2.105.
S. Akter, M. Abdul, M. Sunil, M. Zoynul, A. Charbel, and J. Chiappetta, "Investigation of key performance indicators for performance management of the manufacturing industry in the era of the COVID-19 pandemic," Ann. Oper. Res., vol. 355, no. 2, pp. 2479–2522, 2025, doi: 10.1007/s10479-023-05717-4.
M. Budijanto, Y. Priyandari, and S. E. Sari, "Perancangan Key Performance Indicators ( KPI ) Menggunakan Metode Performance Prism ( Studi Kasus di Batik Putra Bengawan )," vol. 11, no. 2, pp. 153–158, 2012.


