[1]
Hardiana, D. and Shehbubakar, A.N. 2025. Acquisition Of Ownerless Land In The 150 KV Ketapang–Sukadana Transmission Line Project. Jurnal Ilmiah Multidisiplin Indonesia (JIM-ID). 4, 12 (Dec. 2025), 1848–1858.