Factor Affecting Construction Quality On Construction Projects In Central Java With Analytical Hierarchy Process (AHP) Method
Keywords:
Quality, Construction Projects, Analytical Hierarchy Process, Central JavaAbstract
Improvement in project construction should follow increasing quality construction so that project construction can be interpreted as successful if the project construction is the appropriate time, cost, and quality by planning. Research This aims To identify possible factors that influence quality construction using the Analytical Hierarchy Process (AHP), especially in construction projects in Central Java. Using questionnaires and Analytical Hierarchy Process (AHP) analysis for respondents who are experts in the construction sector, it was found that the factors that influence construction quality are money, materials, man, methods, and machines. Developing and implementing project construction: The project must already follow quality and proper construction quality in planning. Existence coordination and work are needed to carry out project construction so that quality construction is achieved by planning. Analysis with the AHP method is carried out for all respondents from each criterion, sub-criteria, and alternative, as well as to get a goal from quality construction. With Analysis of the Analytical Hierarchy Process, the results of each factor influencing construction quality from the highest to the lowest are man at 0.262, materials at 0.253, money at 0.231, methods at 0.142, and machines at 0.112.
Downloads
References
Ahzan, L. N., 2014, “Evaluasi Rencana Manajemen Mutu pada Proyek Pembangunan Jembatan Sungai Semanggi”, Kabupaten Maros, Skripsi, Makassar, Fakultas Teknik, Universitas Hasanuddin.
Anita Rauzana, Dwi Andri Usni, 2020, “Kajian Faktor-Faktor Penyebab Rendahnya Kinerja Mutu Pada Proyek Konstruksi di Provinsi Aceh”, Jurnal Fakultas Teknik Sipil Universitas Syah Kuala, Banda Aceh, Vol 26, No. 2, 2020, 267-274.
Ervianto, (2005), “Manajemen Proyek Konstruksi”, Edisi 2, Penerbit Andi, Yogyakarta
Hafnidar. A. Rani., 2016., “Manajemen Proyek Konstruksi”, Penerbit Deepublish, cetakan Pertama, Yogyakarta, 55581.
PMI, (2013). "A Guide to The Project Management Body, of Knowledge," (PMBOK Guide) – Fifth Edition, Project Management Institute," Pennsylvania.
Saaty, T.L., (1994). "The Analytical Hierarchy Process," McGraw-Hill, New York.
Saaty, Thomas, L., (2004). "Decision Making – The Analytic Hierarchy and Network Processes (AHP/ANP)," Journal of System Science and Systems Engineering Vol. 13.
Saaty, Thomas. L., 2008, “Decision Making With The Analytic Hierarchy Process”, Vol. 1., No, 1.
Sari, A, 2011, “Evaluasi Penerapan Sistem Manajemen Mutu pada Pelaksanaan Konstruksi Jalan di Provinsi Aceh”, Thesis, Banda Aceh, Jurusan Teknik Sipil Universitas Syah Kuala, Jurusan Teknik Sipil Universitas Syah Kuala.
Teknomo, Siswanto, Yudhanto, “Penggunaan Metode Analytical Hierarchy Prosess Dalam Menganalisa Faktor-Faktor yang Mempengaruhi Pemilihan Moda Ke Kampus”, Dimensi Teknik Sipil Volume 1, No. 1 Maret 1999
Ummi Chasanah, Soehartono, 2024, Baswindro, “Penerapan Manajemen Mutu pada Pekerjaan Struktur Beton Pembangunan Gedung ITS Tower 3 di Surabaya”. Jurnal Pondasi, Vol. 29, No. 1, 2024, Hal 112-120.