Performance Analysis of a Three-Blade Savonius Vertical-Axis Wind Turbine Prototype for Charging a 12 V 7 Ah Maintenance-Free Battery

Authors

  • Ihat Solihat Program Studi Teknik Mesin, Fakultas Teknik, Universitas Pamulang
  • Firmansyah Firmansyah Program Studi Teknik Mesin, Fakultas Teknik, Universitas Pamulang

Keywords:

Savonius Wind Turbine, Vertical-Axis Wind Turbine, Battery Charging, Maintenance-Free Battery, Flooded Lead-Acid Battery, Renewable Energy

Abstract

The increasing demand for renewable energy has encouraged the development of small-scale wind energy conversion systems for standalone electricity generation. This study evaluates the performance of a three-blade Savonius vertical-axis wind turbine prototype in charging 12 V, 7 Ah Maintenance-Free and Flooded Lead-Acid batteries. Experimental testing was conducted indoors using a blower as the wind source with three wind source distances (100 cm, 150 cm, and 200 cm), corresponding to different wind speeds. The system performance was evaluated based on wind speed, generator rotational speed, electrical current, output power, power conversion efficiency, battery charging time, and battery endurance under lamp loads of 15 W, 25 W, and 30 W. The results showed that decreasing the distance between the wind source and the turbine increased wind speed, generator rotational speed, charging current, and electrical output power while reducing the battery charging time. The highest output power was obtained at the 100 cm distance with a charging current of 3.4 A and an output power of 10.8 W. The theoretical charging time ranged from 2.0 to 2.8 h; however, the actual charging time was longer because of electrical losses, charging controller characteristics, and battery operating conditions. Battery endurance decreased as the electrical load increased, indicating that higher discharge currents accelerated battery depletion. Overall, the prototype demonstrated the feasibility of using a Savonius vertical-axis wind turbine for small-scale battery charging applications, although improvements in turbine efficiency, energy conversion, and charging system performance are required to enhance practical performance.

Downloads

Download data is not yet available.

References

Anwar, S., Tamam, M. T., & Kurniawan, I. H. (2021). Rancang bangun sistem pembangkit listrik tenaga air menggunakan konsep hydrocat. RESISTOR (Elektronika Kendali Telekomunikasi Tenaga Listrik Komputer), 4(1), 7–10. https://doi.org/10.24853/resistor.4.1.7-10

Arif, I. (2019). Analisis dan pengujian kinerja turbin angin Savonius 4 sudu. Jurnal Teknik Mesin ITI, 3(2), 46–52. https://doi.org/10.31543/jtm.v3i2.307

Brunner, M., Indradjaja, I. M., & Brunner, S. M. (2021). Pemilihan baterai kendaraan listrik dengan metoda weighted objective. Jurnal Serambi Engineering, 6(1), 1563–1572. https://doi.org/10.32672/jse.v6i1.2644

Faharuddin, A., Saputra, A., & Satriani. (2019). Model pembangkit listrik tenaga ombak. Vertex Elektro, 1(2), 19–27. https://doi.org/10.26618/jte.v1i2.2381

Hidayat, M. F., & Surbakti, A. (2021). Turbin angin Savonius 3 sudu untuk lampu perangkap hama untuk masyarakat Kabupaten Cianjur, Jawa Barat. Kami Mengabdi, 1(1), 38–55. https://doi.org/10.52447/km.v1i1.5420

Iskandar, R., Handoko, Elysees, C. B., Ridwanulloh, R., Charisma, A., & Yuliana, H. (2021). Analisis performa baterai jenis valve regulated lead acid pada PLTS off-grid 1 kWp. Jurnal Teknologi, 13(2), 129–140.

Listiana, R., Eva, D., Aryanto, D. D., & Erwin, Y. (2021). Prototipe alat proses pengolah minyak jelantah. TEDC, 15(2), 230–236.

Lumbanraja, N. M. (2021). Perancangan simulasi pembangkit listrik tenaga pasang surut air laut (Bachelor's thesis).

Lung, F. (2020). Sumber energi batu bara Kalimantan Timur (Kaltim) sebagai penopang ekonomi ibu kota negara (IKN) baru. Prosiding Temu Profesi Tahunan PERHAPI, 425–433.

Meliala, S. (2020). Implementasi on-grid inverter pada instalasi rumah tangga untuk masyarakat pedesaan dalam rangka antisipasi krisis energi listrik. Jurnal Litek: Jurnal Listrik Telekomunikasi Elektronika, 17(2), 47–56. https://doi.org/10.30811/litek.v17i2.1902

Nurlaila, & Yuianto, A. T. (2019). Perkembangan energi terbarukan di beberapa negara. Prosiding Seminar Nasional Infrastruktur Energi Nuklir, 11–21.

Pratomo, L. B., & Berkah, F. (2022). Tinjauan singkat optimalisasi pemanfaatan gas bumi pada sektor rumah tangga. Jurnal Teknik Energi, 18(1), 1–11.

Satiawan, I. N. W., Supriono, Citarsa, I. B. F., Suksmadana, I. M. B., & Warindi. (2021). Teknik pengisian ulang baterai alkaline non-rechargeable bekas untuk memperpanjang umur pemakaian. Jurnal Sains Teknologi & Lingkungan, 147–154. https://doi.org/10.29303/jstl.v0i0.249

Simanjuntak, H., & Sumono, S. B. D. (2019). Rancang bangun alat pembangkit listrik tenaga air irigasi. Jurnal Rekayasa. (Data volume, nomor, dan halaman tidak ditemukan dari sumber yang tersedia.)

Sofiah, & Irawan, M. D. (2019). Rancang bangun pengisian akumulator pada pembangkit listrik alternatif untuk kebutuhan listrik rumah tangga. Jurnal Surya Energy, 3(2), 307–315. https://doi.org/10.32502/jse.v3i2.1533

Syarifudin, A. (2019). Perancangan sistem informasi pengajuan dan pelaporan pembayaran tunjangan kinerja Kementerian Keuangan menggunakan metode prototype. Jurnal Sisfokom (Sistem Informasi dan Komputer), 8(2), 149–158. https://doi.org/10.32736/sisfokom.v8i2.641

Zaputra, T. P., & Gusnita, N. (2022). Analisis pengaruh jumlah lilitan dan kecepatan putar terhadap efisiensi pada permanent magnet synchronus generator 18 slot 16 pole. JTEV (Jurnal Teknik Elektro dan Vokasional), 8(2), 411–419. https://doi.org/10.24036/jtev.v8i2.117875

Downloads

Published

2026-07-31

How to Cite

Solihat, I., & Firmansyah, F. (2026). Performance Analysis of a Three-Blade Savonius Vertical-Axis Wind Turbine Prototype for Charging a 12 V 7 Ah Maintenance-Free Battery. Jurnal Info Sains : Informatika Dan Sains, 16(02), 471–483. Retrieved from https://ejournal.seaninstitute.or.id/index.php/InfoSains/article/view/8940