Framework for Consideration of Tool Selection in Bore Pile Work in Uncertain Field Conditions: Literature Study

Authors

  • Alexander Qurnain Universitas Negeri Jakarta
  • Arief Saefudin Universitas Negeri Jakarta
  • Rezi Berliana Yasinta Universitas Negeri Jakarta

Keywords:

Bore Pile, Equipment Selection, Subsurface Uncertainty, Construction Execution, Project Risk

Abstract

The selection of bore pile drilling equipment is a technical decision influenced by multiple interrelated factors. In construction practice, subsurface conditions cannot be fully determined during the planning stage, while operational constraints and considerations of time, cost, and risk further shape the decision-making process. This paper presents a literature-based review aimed at developing a conceptual framework for selecting bore pile drilling equipment, with emphasis on subsurface uncertainty and its implications for construction execution. The study adopts a literature review approach by examining relevant scientific publications, standards, and regulations from the past ten years. The findings indicate that equipment selection should not be viewed as a single or absolute decision, but rather as a multidimensional and context-dependent evaluation process. The proposed framework is intended to support practitioners and researchers in understanding drilling equipment selection as part of risk management in bore pile foundation works

Downloads

Download data is not yet available.

References

Ahmad, R., Hassan, M., & Lee, J. (2023). Adaptive drilling methods for bore pile foundations under variable site conditions. Journal of Construction Engineering and Management, 149(4), 04023012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002456

Ardiyanti, R. (2023). Analisis produktivitas drilling rig pada pekerjaan pondasi bore pile. Jurnal Teknik Sipil, 12(2), 85–94.

Chong, C. S., & Ong, D. E. L. (2020). Data-driven field observational method of a contiguous bored pile wall system affected by accidental groundwater drawdown. Geosciences, 10(10), 392. https://doi.org/10.3390/geosciences10100392

Eurocode 7. (2004). EN 1997-1: Eurocode 7—Geotechnical design—Part 1: General rules. European Committee for Standardization.

Federal Highway Administration. (2010). Drilled shafts: Construction procedures and LRFD design methods (FHWA-NHI-10-016). U.S. Department of Transportation.

Federal Highway Administration. (2018). Geotechnical engineering circular No. 8: Design and construction of drilled shafts (FHWA-HIF-18-013). U.S. Department of Transportation.

Federal Highway Administration. (2016). Geotechnical engineering circular No. 10: Design and construction of driven pile foundations (FHWA-HIF-16-009). U.S. Department of Transportation.

Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2016). Peraturan Menteri PUPR Nomor 28/PRT/M/2016 tentang pedoman analisis harga satuan pekerjaan bidang pekerjaan umum. Kementerian PUPR.

Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2018). Peraturan Menteri PUPR Nomor 22/PRT/M/2018 tentang pedoman pembangunan bangunan gedung negara. Kementerian PUPR.

Li, X., Zhang, Y., & Kumar, S. (2022). Decision-making framework for selecting drilling equipment in uncertain soil conditions. Automation in Construction, 137, 104177. https://doi.org/10.1016/j.autcon.2022.104177

Phoon, K. K. (2022). Geotechnical uncertainty: Modeling and decision making. Soils and Foundations, 62(3), 101–118. https://doi.org/10.1016/j.sandf.2022.01.004

Qurnain, A., et.al., (2025). Faktor-faktor yang memengaruhi rate of penetration pada pengeboran bore pile: Studi literatur. Jurnal Pendidikan Teknologi dan Kejuruan, 31(1), 45–58.

Soetjipto, H., Prasetyo, D., & Wibowo, A. (2023). Pengaruh efisiensi sumber daya terhadap produktivitas pekerjaan bore pile. Jurnal Rekayasa Sipil, 17(1), 23–31.

Standar Nasional Indonesia. (2017). SNI 8460:2017 Persyaratan perancangan geoteknik. Badan Standardisasi Nasional.

Tomlinson, M., & Woodward, J. (2015). Pile design and construction practice (6th ed.). CRC Press.

Wang, H., & Chen, T. (2021). Integrating technical and operational considerations for bore pile equipment selection. Tunnelling and Underground Space Technology, 113, 103937. https://doi.org/10.1016/j.tust.2021.103937

Zhang, L., Tang, W. H., & Phoon, K. K. (2016). Reliability-based design of pile foundations considering soil variability. Canadian Geotechnical Journal, 53(9), 1471–1484. https://doi.org/10.1139/cgj-2015-0503

Zhao, J., Liu, H., & Wang, J. (2019). Effects of construction uncertainties on bored pile performance. Journal of Geotechnical and Geoenvironmental Engineering, 145(6), 04019025. https://doi.org/10.1061/(ASCE)GT.1943-5606.0002063

Downloads

Published

2026-01-28

How to Cite

Alexander Qurnain, Arief Saefudin, & Rezi Berliana Yasinta. (2026). Framework for Consideration of Tool Selection in Bore Pile Work in Uncertain Field Conditions: Literature Study. Jurnal Multidisiplin Sahombu, 6(02), 133–138. Retrieved from https://ejournal.seaninstitute.or.id/index.php/JMS/article/view/8042