Quality Control System in the Implementation of High-Rise Building Construction Projects

Authors

  • Ummi Chasanah Program Studi Teknik Sipil, Fakultas Teknik Universitas Pandanaran, Jl Banjarsari Barat No.1 Semarang Indonesia
  • Soehartono Soehartono Program Studi Teknik Sipil, Fakultas Teknik Universitas Pandanaran, Jl Banjarsari Barat No.1 Semarang Indonesia

Keywords:

supervision, construction quality, building information modeling

Abstract

System supervision quality project construction is the part that focuses on the process of directing, controlling, in implementation achievement results related construction with target quality project construction. System management quality which is quality plan with identification quality project required construction. So that implementation project construction in documentation during implementation ongoing projects ongoing with objective for reach quality construction as required. Supervision quality construction done to produce appropriate construction required quality in plan construction. In order to fulfill hope owner and maintain quality construction in the field project construction, so that the results obtained in accordance with plan. Implementation efforts project construction in frame for get standard quality from provider services. Parties contractor must can carry out quality in accordance with quality plan, so that results quality in accordance with condition plans and sni. The purpose of study this is for know supervision quality construction in building construction in a way general and specific development uin maulana malik ibrahim malang building. Research this done with method interviews, observations, and the use of bim (building information modeling).

Downloads

Download data is not yet available.

References

azhar, s. (2017). Building information modeling (bim): benefits, risks and challenges. Automation in construction, 20(2), 241–252. Doi:10.1016/j.autcon.2011.09.009

Bappenas. (2022). National guidelines for implementation bim in indonesia. Jakarta: directorate general of human settlements, ministry of pupr.

Eastman, c., teicholz, p., sacks, r., & liston, k. (2018). Bim handbook: a guide to building information modeling for owners, managers, designers, engineers and contractors (3rd ed.). Hoboken, nj: wiley.

Ferial, r., hidayat, b., pesela, rc, & daoed, d. (2022). Quantity take-off based on building information modeling (bim) study case: building regional development planning agency padang. Journal engineering civil (jrs- unand), 17(3), 228. Https://doi.org/10.25077/jrs.17.3.228-238.2021

Hafnidar. A. Rani., 2016., “ management project construction ”, publisher deepublish, print first, yogyakarta, 55581.

Khosrowshahi, f., & arayici, y. (2015). Roadmap for implementation of bim in the uk construction industry. Engineering, construction and architectural management, 19(6), 610–635.

Ministry of public works and public housing. (2018). Regulation of the minister of public works and public housing number 22/prt/m/2018 concerning the construction of state buildings with bim. Jakarta: ministry of public works and public housing.

Ministry of public works and public housing. (2020). Regulation of the minister of public works and public housing number 22/prt/m/2018 concerning the construction of state buildings with bim. Jakarta: ministry of public works and public housing.

Nugraha, r., & prasetyo, a. (2021). Bim-based quantity take-off using revit and costx: a case study of building project. Journal of civil and environmental engineering, 7(1), 12–20.

Ramadiaprani r, " building information modeling (bim) applications using tekla structures 17 software in construction building studying three floor faculty of forestry, ipb, institute agriculture bogor, bogor, 2012

Sari, a, 2011, “evaluation of the implementation of quality management system in road construction implementation in aceh province”, thesis, banda aceh, civil engineering department, syah kuala university, civil engineering department, syah kuala university.

Ummi chasanah, soehartono, baswindro 2024,, “ implementation quality management at work concrete structure for the construction of its tower 3 building in surabaya”. Journal foundation, vol. 29, no. 1, 2024, pp. 112-120.

Downloads

Published

2026-02-17

How to Cite

Ummi Chasanah, & Soehartono, S. (2026). Quality Control System in the Implementation of High-Rise Building Construction Projects. Jurnal Info Sains : Informatika Dan Sains, 16(01), 87–92. Retrieved from https://ejournal.seaninstitute.or.id/index.php/InfoSains/article/view/8248