ANALYSIS OF TIME ACCELERATION OF THE XYZ BUILDING PROJECT

Authors

  • Sugeng Santoso Faculty of Economics and Business, Mercu Buana University
  • Ester Melina Faculty of Economics and Business, Mercu Buana University
  • Priskila Dorothy Faculty of Economics and Business, Mercu Buana University
  • Unggul Wahyu Aji Faculty of Economics and Business, Mercu Buana University

Keywords:

Acceleration, Cost, Work Hours, Workers

Abstract

Contract time that has been decided in the beginning is the time for contractors to start and finish the project. But if the contractor should finish the project early from the contract, it should be accelerated. The consequence of accelerating will increase cost, caused by increased working time or manpower. The purpose of this research is to know the increasing cost amount after accelerating the project XYZ building. Quantitative descriptive is used in this study, with critical path & MS Project method. The result of this research is to count the additional cost after acceleration as 3 times more than begging. We can conclude that acceleration will increase more cost. We suggest the contractor ask for additional costs from the owner, so the project acceleration can be done in time. 

Downloads

Download data is not yet available.

References

Adismar, Ryan, Sugeng Santoso, Karunia Burhan Pramudhita, Rofiq Kurniawan, and M. Romi Bahtiar. 2021. “Analisa Kedisiplinan Dan Kompensasi Terhadap Produktivitas Tenaga Kerja Yang Berpengaruh Pada Waktu Konstruksi Di PT. UAO (Proyek BKD).” Syntax Literate ; Jurnal Ilmiah Indonesia 6(6):3007. doi: 10.36418/syntax-literate.v6i6.3152.

Artika, Dian, Jl Srijaya Negara, Besar Palembang, and Sumatera Selatan. 2014. PENERAPAN METODE LEAN PROJECT MANAGEMENT DALAM PROYEK KONSTRUKSI PADA PEMBANGUNAN GEDUNG DPRD KABUPATEN OGAN ILIR. Vol. 2.

Burhanudin Gesi, Rahmat Laan, and Fauziyah Lamaya. 2019. “Manajemen Dan Eksekutif .” Jurnal Manajemen 3(2303–3495):1–16.

Efrizon, Masydzulhak Djamil Mz, Sugeng Santoso, and Ahmad H. Sutawijaya. 2022. “Optimalisasi Kinerja Tim Proyek Dengan Memanfaatkan Metode CPM Dan PERT Dalam Pekerjaan Pematangan Lahan.” Fair Value: Jurnal Ilmiah Akuntansi Dan Keuangan 4(8):3610–22. doi: 10.32670/fairvalue.v4i8.1465.

Gloria Putri, Caesarani, and Sugeng Santoso. 2020. “Analisis Transformasi Digitalisasi Melalui Aplikasi Sistem Integrasi Konstruksi Terhadap Produktivitas Kerja Quantity Surveyor Proyek Konstruksi Bangunan Gedung.” Jurnal Ilmiah Manajemen Bisnis (JIMB) 6(03):335–46. doi: 10.22441/jimb.

Harahap, Baru, and Argo Putra Prima. 2019. PENGARUH BIAYA BAHAN BAKU, BIAYA TENAGA KERJA LANGSUNG DAN FACTORY OVERHEAD COST TERHADAP PENINGKATAN HASIL PRODUKSI PADA PERUSAHAAN KECIL INDUSTRI TAHU TEMPE DI KOTA BATAM. Vol. 4.

Malifa, Yusuf, Ariestides K. T. Dundu, and Grace Y. Malingkas. 2019. “Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Menggunakan Metode Crashing (Studi Kasus: Pembangunan Rusun IAIN Manado).” Jurnal Sipil Statik 7(Juni):681–88.

Nyoman, I., and Yudha Astana. 2017. ESTIMASI BIAYA KONSTRUKSI GEDUNG DENGAN COST SIGNIFICANT MODEL. Vol. 1.

Oktavia, Amanda, Michelle Rompis, Revo L. Ingkiriwang, and Mochtar Sibi. 2019. “Optimasi Waktu Proyek Dengan Penambahan Jam Kerja Menggunakan Precedence Diagram Methode Pada Proyek Rahabilitasi Puskesmas Minanga.” Jurnal Sipil Statik 7(9):1203–10.

Padma Arianie, Ganesstri, and Nia Budi Puspitasari. 2017. PERENCANAAN MANAJEMEN PROYEK DALAM MENINGKATKAN EFISIENSI DAN EFEKTIFITAS SUMBER DAYA PERUSAHAAN (Studi Kasus : Qiscus Pte Ltd). Vol. 12.

Patricia Kanicia Djawu, Method, and Ayu Rosita. 2021. “Analysis of the Acceleration of Time and Cost of Construction Projects with Additional Work Hours / Overtime and Labor Using the Time Cost Trade Off.” World Journal of Business, Project and Digital Management 2(1):54–61.

Priyo, Mandiyo, and Adi Sumanto. 2016. “Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade off : Studi Kasus Proyek Pembangunan Prasarana.” Jurnal Ilmiah Semesta Teknika 19(1):1–15. doi: 10.18196/st.v19i1.2233.

Rachmadini, Fernanda, and Sugeng Santoso. 2021. “Peran Project Owner Dalam Menjalankan Agile Project Management (Studi Kasus: PT. XYZ) The Role of the Project Owner to Run the Agile Project Management (Case Study: PT. XYZ).” Jurnal Manajemen Dan Organisasi (JMO) 12(3):166–76. doi: 10.29244/jmo.v12i3.33326.

Soeharto, Iman. 1995. Manajemen Proyek : Dari Konseptual Sampai Operasional. Jakarta: Erlangga.

Sugeng Santoso, Indra Siswanti, R. Nurhidajat, Salmi Mohd. Isa, and Muhammad Ramadhani Marfatah. 2022. “Measuring Model of Infrastructure Provision Readiness with Sharia PPP Financing Scheme Using the IRL AndTRL Concept Approach.” IQTISHODUNA: Jurnal Ekonomi Islam 11(2):1–14.

Wale, P. M., N. D. Jain, N. R. Godhani, S. R. Beniwal, and A. A. Mir. n.d. “Planning and Scheduling of Project Using Microsoft Project (Case Study of a Building in India).” IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN 12(3):57–63. doi: 10.9790/1684-12335763.

Yuwono, Wiji, M. Elfan Kaukab, and Yusqi Mahfud. 2021. “Kajian Metode PERT-CPM Dan Pemanfaatannya Dalam Manajemen Waktu Dan Biaya Pelaksanaan Proyek.” Journal of Economic, Management, Accounting and Technology 4(2):192–214. doi: 10.32500/jematech.v4i2.1925.

Downloads

Published

2022-12-12

How to Cite

Santoso, S., Melina, E., Dorothy, P., & Aji, U. W. (2022). ANALYSIS OF TIME ACCELERATION OF THE XYZ BUILDING PROJECT. Jurnal Ekonomi, 11(03), 1280–1286. Retrieved from https://ejournal.seaninstitute.or.id/index.php/Ekonomi/article/view/927

Most read articles by the same author(s)